Studio 60 on the Sunset Strip - Season 1 Episode 5 The Long Lead Story

Studio 60 on the Sunset Strip
Available Formats Studio 60 on the Sunset Strip Secure Scanned : 10/31/2024 Watch HD Download HD
Studio 60 on the Sunset Strip

Studio 60 on the Sunset Strip - Season 1 Episode 5 The Long Lead Story

Studio 60 on the Sunset Strip - Season 1 Episode 5 The Long Lead Story

Overview: During cast rehearsals with Lauren Graham and Sting, a reporter attempts to get the real story on Matt and Harriet. Meanwhile Jordan passes on a tasteless new reality series.

Watch Trailer First Air Date: Sep 18, 2006 Last Air date: Jun 28, 2007 Season: 1 Season Episode: 22 Episode Runtime: 42 minutes Quality: HD IMDb: 7.38 / 10 by 117 users Popularity: 26.348 Language: English

Similar Movies

Recomendation Movies